Muncie Water Pollution Control Facility 2016 Upgrades
Muncie, IN

The 2016 upgrades to the Muncie wastewater treatment plant included several structures. FRP performed structural design for the new UV facility, which was a conventionally reinforced concrete structure with a pre-engineered building above. The structural design for the wet weather pump station, electrical building, settling tank, and a junction structure was performed in part by FRP staff while with another firm.